Hostos community college
Bronx, NY
The existing 5 story building was completely gutted out with the exception of floors, columns, roof and shell of the building. 2 additional floors with a total floor area was 176,000 sft was added. Shenoy was engaged to perform the feasibility study, engineering design and construction services for the complete mechanical and electrical systems as well as the expansion of the central refrigeration plant. We modernized and reconstructed spaces – classrooms, computer and science labs, adding air conditioning and new fume hoods.